Item Description
Material quality |
SUS304N |
SUS304L |
density |
6.4-6.7g/CM³ |
6.6-6.9g/CM³ |
Sintering hardness |
HRB45-75 |
HRB40-70 |
Sintering toughness |
390MPaMIN |
300MPaMIN |
Rust prevention performance |
Salt spray examination 48HMIN |
Salt spray take a look at 48HMIN |
Certifications |
ISO9001/TS16949 |
|
Surface area Remedy |
Large Frequency quenching, Oil impregnation |
|
Apperance |
No Crumbling, Cracks, Exfoliation, Voids, CZPT Pitting and CZPT Flaws |
|
Approach Stream |
Powder mixing – Forming – Sintering – Oil impregnation – Sizing -Ultrasonic CZPT ing – Steam Oxidation – Oil impregnation – Closing inspection – Packing |
|
Software |
Market,Car, CZPT Instruments, CZPT , Bicycle, CZPT ctrombile |
one.Q:Are you investing company or company?
A: We are manufacturing unit with more then 15years knowledge
two.Q: How CZPT is your delivery time?
A: Generally it is fifteen-30days as we are CZPT ized support we affirm with CZPT er when
spot order
3.Q:Do you supply samples? ls it cost-free or additional?
A: Sure we provide samples .for sample cost as for each sample situation to determine totally free or
billed ,typically for not way too a lot time utilized consumed machining method are cost-free
four.Q:What is your phrases of payment?
thirty% T/T in CZPT stability ahead of shipment .Or as for each discussion
five.Q: Can we know the production approach with no browsing the factory?
A:We will offer you in depth creation timetable and send out weekly reports with electronic photos
and videos which display the machining progress
six.Q:Offered for CZPT ized design drawings?
A: YesDWG.DXF.DXW.IGES.Phase. PDF and so on
7.Q:Accessible for CZPT ized style drawings?
A: Indeed ,we can signal the NDA before your deliver the drawing
eight.Q:How do you promise the quality?
A:(1) Checking the uncooked content right after they achieve CZPT manufacturing facility——
Incoming high quality control(IQC)
(2) Checking the information ahead of the production line operated
(3) Have a complete inspection and routing inspection for the duration of mass production—
In-approach high quality manage(IPQC)
(4) Examining the products following they are concluded—- Last quality control(FQC)
(5) Examining the items right after they are completed—–Outgoing top quality control(QC)
(6)one hundred% inspection and shipping prior to cargo.
Idler: A pushed wheel that does not transmit electricity through a shaft. It spins freely, and most driven pulleys are related to other products, this sort of as wheels or drives, via driveshafts.